• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0049

Lessons Learned - Firex Deluge Valve Configurations

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1991

Abstract: Description of Driving Event:
The remote manual arming and firing valves are in the "on" position when perpendicular to the water lines, which is not the industry norm for hydraulic systems. This contributed to the OPF GSE technicians believing they were closing the valves by positioning them perpendicular to the water line when, in fact, they were opening the valves. This misinterpretation resulted in the activation of zones 1,2,3,4, and 5 of the bay 2 Firex deluge system.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/187010
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.84Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0049

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:04:07Z
date available2017-09-04T18:04:07Z
date copyright33595
date issued1991
identifier otherGFYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/187010
description abstractDescription of Driving Event:
The remote manual arming and firing valves are in the "on" position when perpendicular to the water lines, which is not the industry norm for hydraulic systems. This contributed to the OPF GSE technicians believing they were closing the valves by positioning them perpendicular to the water line when, in fact, they were opening the valves. This misinterpretation resulted in the activation of zones 1,2,3,4, and 5 of the bay 2 Firex deluge system.
languageEnglish
titleNASA-LLIS-0049num
titleLessons Learned - Firex Deluge Valve Configurationsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1991
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsFire Protection
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsIndustrial Operations
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian