• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5836

Lessons Learned – Overturned Mobile Crane at Jay Jay Railroad Draw Bridge

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: A NASA contractor was engaged in setting pilings using a hydraulic vibratory driver / extractor(HVDE) and a lattice boom mobile crane atop a barge in the Indian River north of Titusville, Florida. Several pilings had already been successfully placed earlier that day. During crane movement to position the final piling, the load on the hook exceeded the crane's capacity and caused the crane to tip over. A closed-loop process should be used to verify the correctness of data contained in lift plans.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/187569
Subject: Additional Categories.Ground Equipment
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (59.74Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5836

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:04:36Z
date available2017-09-04T18:04:36Z
date copyright40854
date issued2011
identifier otherGHLHOEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/187569
description abstractA NASA contractor was engaged in setting pilings using a hydraulic vibratory driver / extractor(HVDE) and a lattice boom mobile crane atop a barge in the Indian River north of Titusville, Florida. Several pilings had already been successfully placed earlier that day. During crane movement to position the final piling, the load on the hook exceeded the crane's capacity and caused the crane to tip over. A closed-loop process should be used to verify the correctness of data contained in lift plans.
languageEnglish
titleNASA-LLIS-5836num
titleLessons Learned – Overturned Mobile Crane at Jay Jay Railroad Draw Bridgeen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsAdditional Categories.Ground Equipment
subject keywordsAdditional Categories.Ground Operations
subject keywordsAdditional Categories.Hardware
subject keywordsAdditional Categories.Lifting Devices
subject keywordsAdditional Categories.Mishap Reporting
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian