Lessons Learned - Operations and Checkout (O&C) 4-ton Monorail Crane Operations

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:10:44Z
date available2017-09-04T18:10:44Z
date copyright09/25/1992
date issued1992
identifier otherGXYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/193725
description abstractDescription of Driving Event:
The 4-ton monorail crane is used to handle flight related equipment and flight hardware in the operations and checkout building. The crane operator is not able to control the load or terminate all power in an emergency situation because the 4-ton crane lacks required safety devices. The crane operator does not have direct access to the main circuit breaker in the event of crane speed control system failure or other hoisting failure. By removing power to the crane, the crane brakes are set and all system movement is halted.
languageEnglish
titleNASA-LLIS-0137num
titleLessons Learned - Operations and Checkout (O&C) 4-ton Monorail Crane Operationsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsGround Operations
subject keywordsIndustrial Operations
subject keywordsLifting Devices