NASA-LLIS-0137
Lessons Learned - Operations and Checkout (O&C) 4-ton Monorail Crane Operations
Year: 1992
Abstract: Description of Driving Event:
The 4-ton monorail crane is used to handle flight related equipment and flight hardware in the operations and checkout building. The crane operator is not able to control the load or terminate all power in an emergency situation because the 4-ton crane lacks required safety devices. The crane operator does not have direct access to the main circuit breaker in the event of crane speed control system failure or other hoisting failure. By removing power to the crane, the crane brakes are set and all system movement is halted.
The 4-ton monorail crane is used to handle flight related equipment and flight hardware in the operations and checkout building. The crane operator is not able to control the load or terminate all power in an emergency situation because the 4-ton crane lacks required safety devices. The crane operator does not have direct access to the main circuit breaker in the event of crane speed control system failure or other hoisting failure. By removing power to the crane, the crane brakes are set and all system movement is halted.
Subject: Ground Operations
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T18:10:44Z | |
| date available | 2017-09-04T18:10:44Z | |
| date copyright | 09/25/1992 | |
| date issued | 1992 | |
| identifier other | GXYCQCAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/193725 | |
| description abstract | Description of Driving Event: The 4-ton monorail crane is used to handle flight related equipment and flight hardware in the operations and checkout building. The crane operator is not able to control the load or terminate all power in an emergency situation because the 4-ton crane lacks required safety devices. The crane operator does not have direct access to the main circuit breaker in the event of crane speed control system failure or other hoisting failure. By removing power to the crane, the crane brakes are set and all system movement is halted. | |
| language | English | |
| title | NASA-LLIS-0137 | num |
| title | Lessons Learned - Operations and Checkout (O&C) 4-ton Monorail Crane Operations | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1992 | |
| contenttype | fulltext | |
| subject keywords | Ground Operations | |
| subject keywords | Industrial Operations | |
| subject keywords | Lifting Devices |

درباره ما