• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0928

Lessons Learned - KAO Aft Bulkhead Installation

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1972

Abstract: Description of Driving Event:
The aft cavity bulkhead was built entirely outside the aircraft with no requirements to demonstrate the actual fit inside the aircraft. After manufacturing was complete, it was discovered that the aft bulkhead did not fit inside the aircraft. An investigation of this problem revealed that the dimensions on the drawings were incorrect. The aft bulkhead wall had to be removed and modified. This additional work cost the project a delay of about 3 weeks.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/194422
Subject: Ground Operations
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.76Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0928

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:11:26Z
date available2017-09-04T18:11:26Z
date copyright26609
date issued1972
identifier otherGZTEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/194422
description abstractDescription of Driving Event:
The aft cavity bulkhead was built entirely outside the aircraft with no requirements to demonstrate the actual fit inside the aircraft. After manufacturing was complete, it was discovered that the aft bulkhead did not fit inside the aircraft. An investigation of this problem revealed that the dimensions on the drawings were incorrect. The aft bulkhead wall had to be removed and modified. This additional work cost the project a delay of about 3 weeks.
languageEnglish
titleNASA-LLIS-0928num
titleLessons Learned - KAO Aft Bulkhead Installationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1972
contenttypefulltext
subject keywordsGround Operations
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian