• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0001

Lessons Learned - Implementation of Procedural Controls in Additional Procedures Beyond the Procedure Under Investigation and Correction

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1991

Abstract: Description of Driving Event:
During prelaunch check out of shuttle orbiter OV-104 for flight STS-36, the AC2 buss phase a voltage fluctuated between 112 and 122V for one minute. The inverter supplying that buss was removed and replaced. The vendors' inspection of the failed inverter found loose mounting screws on the electrical buss internal to the inverter, which caused the voltage fluctuations. An identical problem had been previously discovered that prompted a change to the manufacturing procedures to include a specified torque for the mounting screws. The failed flight unit had been reworked, but the manufacturing procedural change had not been incorporated into the rework process.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/194860
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.09Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0001

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:11:53Z
date available2017-09-04T18:11:53Z
date copyright04/10/1991
date issued1991
identifier otherHAYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/194860
description abstractDescription of Driving Event:
During prelaunch check out of shuttle orbiter OV-104 for flight STS-36, the AC2 buss phase a voltage fluctuated between 112 and 122V for one minute. The inverter supplying that buss was removed and replaced. The vendors' inspection of the failed inverter found loose mounting screws on the electrical buss internal to the inverter, which caused the voltage fluctuations. An identical problem had been previously discovered that prompted a change to the manufacturing procedures to include a specified torque for the mounting screws. The failed flight unit had been reworked, but the manufacturing procedural change had not been incorporated into the rework process.
languageEnglish
titleNASA-LLIS-0001num
titleLessons Learned - Implementation of Procedural Controls in Additional Procedures Beyond the Procedure Under Investigation and Correctionen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1991
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsFlight Equipment
subject keywordsHardware
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian