• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0469

Lessons Learned – Special Tests at KSC

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1993

Abstract: Description of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) took longer than projected to perform a special module acoustical test. This occurred on the last Mission Sequence Test (MST) day and caused the MST time slice to be shortened. MST days are scheduled as full 12-hour test days and have no room for special tests.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/196812
Subject: Ground Operations
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.81Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0469

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:13:51Z
date available2017-09-04T18:13:51Z
date copyright34281
date issued1993
identifier otherHGCEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/196812
description abstractDescription of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) took longer than projected to perform a special module acoustical test. This occurred on the last Mission Sequence Test (MST) day and caused the MST time slice to be shortened. MST days are scheduled as full 12-hour test days and have no room for special tests.
languageEnglish
titleNASA-LLIS-0469num
titleLessons Learned – Special Tests at KSCen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1993
contenttypefulltext
subject keywordsGround Operations
subject keywordsPolicy & Planning
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian