• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1095

Lessons Learned – Construction Site Safety: Coordination of Requirements, Power Compatibility, Design Review, Submittal Review

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2001

Abstract: Description of Driving Event:
The Center has an existing campus complex of modular buildings fed by a main distribution panel (MDP) with 120-208 volt/3 phase power output. A recent project added 3 more buildings to the complex, each having its own 120-208 volt/3 phase power panel. The mechanical engineer specified HVAC units by specific brand name and numeric catalog number, "or approved equal". Embedded in that catalog number was a letter code that denoted the specific voltage for the HVAC equipment motors. In this case it denoted 480 volt power. The electrical drawings and specifications (provided by NASA) showed 120-208 volt power supply. Therefore, the mechanical subcontractor furnished and installed exactly what NASA specified and approved during product submittals. It was only when the HVAC equipment was actually installed in the field, and the electrical subcontractor tried to connect up the 208 volt circuit feeder that anyone realized that there was insufficient voltage to power the specified 480 volt HVAC motors.
NASA had several options: (1) Remove the 480 volt equipment and replace them with new 208 volt equipment. (2) Run new 480 volt circuits back to the campus main switchgear. (3) Install new additional step-up transformers for each of the 3 HVAC units. Due to constructability, cost and schedule impacts, option #3 was selected.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/201658
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (14.95Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1095

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:18:58Z
date available2017-09-04T18:18:58Z
date copyright08/27/2001
date issued2001
identifier otherHSUEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/201658
description abstractDescription of Driving Event:
The Center has an existing campus complex of modular buildings fed by a main distribution panel (MDP) with 120-208 volt/3 phase power output. A recent project added 3 more buildings to the complex, each having its own 120-208 volt/3 phase power panel. The mechanical engineer specified HVAC units by specific brand name and numeric catalog number, "or approved equal". Embedded in that catalog number was a letter code that denoted the specific voltage for the HVAC equipment motors. In this case it denoted 480 volt power. The electrical drawings and specifications (provided by NASA) showed 120-208 volt power supply. Therefore, the mechanical subcontractor furnished and installed exactly what NASA specified and approved during product submittals. It was only when the HVAC equipment was actually installed in the field, and the electrical subcontractor tried to connect up the 208 volt circuit feeder that anyone realized that there was insufficient voltage to power the specified 480 volt HVAC motors.
NASA had several options: (1) Remove the 480 volt equipment and replace them with new 208 volt equipment. (2) Run new 480 volt circuits back to the campus main switchgear. (3) Install new additional step-up transformers for each of the 3 HVAC units. Due to constructability, cost and schedule impacts, option #3 was selected.
languageEnglish
titleNASA-LLIS-1095num
titleLessons Learned – Construction Site Safety: Coordination of Requirements, Power Compatibility, Design Review, Submittal Reviewen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2001
contenttypefulltext
subject keywordsFacilities
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian