• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6496

Lessons Learned - Integrate Earned Value Management Tools With the Project Management System

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: For EVM to apply timely and effective corrective action to minimize cost overruns, it must be fully integrated with the project management systems that supply up-to-date budget, schedule, and cost data. EVM pilot exercises performed on two NASA projects were constrained by the inability to adequately "feed" the automated EVM analysis tool with the data needed to generate EVM products. The financial and scheduling systems for managing the NASA project and providing configuration control must be sufficiently mature to support the integration of an EVM process into the project.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/205391
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (108.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6496

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:22:59Z
date available2017-09-04T18:22:59Z
date copyright04/04/2012
date issued2012
identifier otherICWBXEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/205391
description abstractFor EVM to apply timely and effective corrective action to minimize cost overruns, it must be fully integrated with the project management systems that supply up-to-date budget, schedule, and cost data. EVM pilot exercises performed on two NASA projects were constrained by the inability to adequately "feed" the automated EVM analysis tool with the data needed to generate EVM products. The financial and scheduling systems for managing the NASA project and providing configuration control must be sufficiently mature to support the integration of an EVM process into the project.
languageEnglish
titleNASA-LLIS-6496num
titleLessons Learned - Integrate Earned Value Management Tools With the Project Management Systemen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian