• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0191

Lessons Learned - Preintegrated Truss (PIT) Sections for Space Station Freedom

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
The use of truss segments, which are preintegrated with distributed systems and verified on the ground instead of erected on-orbit, has reduced technical risk and made the space station a more viable program. The preintegrated truss members (PIT) must be heavier than the original truss elements per running foot because the entire mass of the PIT is subjected to launch loads.
PIT members are aluminum I-beams bolted together instead of the more flexible graphite composite elements that previously were part of the design. The heavier construction allows orbit replaceable units (ORUS) to be located in their optimum positions for accessibility.
One benefit of the restructured design is that EVA time has been reduced considerably so that EVA targets are now feasible. This has been accomplished by reducing the demand for EVAs and increasing the efficiency of those that must be performed.
In the assembly of the PIT sections on-orbit, a capture latch provides final alignment by engaging guide pins after the sections are brought into proximity by the space shuttle remote manipulator arm. Motorized bolts then make the final latch-up. There is a chance that these sections may not line up correctly; therefore, damage may occur to the guide pins and bolts when the motorized bolts engage. Because the PIT sections will be assembled on the ground, the opportunity exists to test the alignment and mating procedures prior to flight.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/205439
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.34Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0191

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:23:01Z
date available2017-09-04T18:23:01Z
date copyright33912
date issued1992
identifier otherAGZCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/205439
description abstractDescription of Driving Event:
The use of truss segments, which are preintegrated with distributed systems and verified on the ground instead of erected on-orbit, has reduced technical risk and made the space station a more viable program. The preintegrated truss members (PIT) must be heavier than the original truss elements per running foot because the entire mass of the PIT is subjected to launch loads.
PIT members are aluminum I-beams bolted together instead of the more flexible graphite composite elements that previously were part of the design. The heavier construction allows orbit replaceable units (ORUS) to be located in their optimum positions for accessibility.
One benefit of the restructured design is that EVA time has been reduced considerably so that EVA targets are now feasible. This has been accomplished by reducing the demand for EVAs and increasing the efficiency of those that must be performed.
In the assembly of the PIT sections on-orbit, a capture latch provides final alignment by engaging guide pins after the sections are brought into proximity by the space shuttle remote manipulator arm. Motorized bolts then make the final latch-up. There is a chance that these sections may not line up correctly; therefore, damage may occur to the guide pins and bolts when the motorized bolts engage. Because the PIT sections will be assembled on the ground, the opportunity exists to test the alignment and mating procedures prior to flight.
languageEnglish
titleNASA-LLIS-0191num
titleLessons Learned - Preintegrated Truss (PIT) Sections for Space Station Freedomen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian