• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0963

Lessons Learned – Space Shuttle Main Engine (SSME): Start Sequence Investigations

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1995

Abstract: Description of Driving Event:
Computer mathematical models had shown the engine to be sensitive to small changes in propellant conditions, and that timing relative to opening the propellant valves was critical. Expecting difficulties, a cautious step-by-step plan was followed to explore the start sequence in small time increments. It took 35 weeks and a series of 37 test, including 13 turbopump replacements to extend reliable performance form the 2-second startup transient to main power level.
URI: http://yse.yabesh.ir/std;jsessionid=3826AF679D40527318548F1EFDEC014A/handle/yse/225526
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.08Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0963

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:44:10Z
date available2017-09-04T18:44:10Z
date copyright05/15/1995
date issued1995
identifier otherKDUEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=3826AF679D40527318548F1EFDEC014A/handle/yse/225526
description abstractDescription of Driving Event:
Computer mathematical models had shown the engine to be sensitive to small changes in propellant conditions, and that timing relative to opening the propellant valves was critical. Expecting difficulties, a cautious step-by-step plan was followed to explore the start sequence in small time increments. It took 35 weeks and a series of 37 test, including 13 turbopump replacements to extend reliable performance form the 2-second startup transient to main power level.
languageEnglish
titleNASA-LLIS-0963num
titleLessons Learned – Space Shuttle Main Engine (SSME): Start Sequence Investigationsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1995
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsCryogenic Systems
subject keywordsGround Equipment
subject keywordsHardware
subject keywordsLaunch Vehicle
subject keywordsParts Materials & Processes
subject keywordsSafety & Mission Assurance
subject keywordsSpacecraft
subject keywordsTest Article
subject keywordsTest Facility
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian