• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0311

Lessons Learned – STS-56 High Rate Data Channel Failure Impact to ATMOS Experiment

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1994

Abstract: Abstract:
The high rate data channel for ATMOS failed. No complete end-to-end test had been performed either prior to or after the flight. The recommendations point out the need for end-to-end testing (including tests to identify the failure mode before the payload is disassembled), pre-planned work arounds, and channels of communication from the PI to the mission manager.
URI: http://yse.yabesh.ir/std;jsessionid=3826AF679D40527318548F1EFDEC014A/handle/yse/229010
Subject: Test & Verification
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (15.48Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0311

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:47:46Z
date available2017-09-04T18:47:46Z
date copyright02/03/1994
date issued1994
identifier otherKNAEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=3826AF679D40527318548F1EFDEC014A/handle/yse/229010
description abstractAbstract:
The high rate data channel for ATMOS failed. No complete end-to-end test had been performed either prior to or after the flight. The recommendations point out the need for end-to-end testing (including tests to identify the failure mode before the payload is disassembled), pre-planned work arounds, and channels of communication from the PI to the mission manager.
languageEnglish
titleNASA-LLIS-0311num
titleLessons Learned – STS-56 High Rate Data Channel Failure Impact to ATMOS Experimenten
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1994
contenttypefulltext
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian