UFC 1-300-09N CHANGE 8
DESIGN PROCEDURES
Organization:
UFC - Unified Facilities Criteria
Year: 2011
Abstract: PURPOSE AND SCOPE.
This UFC provides policy and standards for the design, development, and revision of project documents, including drawings, specifications, and Requests for Proposal, for facilities under the cognizance of NAVFAC. This UFC has been developed to ensure consistency and clarity of project documents that form the basis of contracts for the design and construction of facilities.
This UFC provides policy and standards for the design, development, and revision of project documents, including drawings, specifications, and Requests for Proposal, for facilities under the cognizance of NAVFAC. This UFC has been developed to ensure consistency and clarity of project documents that form the basis of contracts for the design and construction of facilities.
Collections
:
-
Statistics
UFC 1-300-09N CHANGE 8
Show full item record
contributor author | UFC - Unified Facilities Criteria | |
date accessioned | 2017-09-04T18:02:45Z | |
date available | 2017-09-04T18:02:45Z | |
date copyright | 02/17/2011 | |
date issued | 2011 | |
identifier other | GCMTXEAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;jsessionid=BBE8185F4818DB884166C94D350F130D/handle/yse/185690 | |
description abstract | PURPOSE AND SCOPE. This UFC provides policy and standards for the design, development, and revision of project documents, including drawings, specifications, and Requests for Proposal, for facilities under the cognizance of NAVFAC. This UFC has been developed to ensure consistency and clarity of project documents that form the basis of contracts for the design and construction of facilities. | |
language | English | |
title | UFC 1-300-09N CHANGE 8 | num |
title | DESIGN PROCEDURES | en |
type | standard | |
page | 90 | |
status | Active | |
tree | UFC - Unified Facilities Criteria:;2011 | |
contenttype | fulltext |