ASHRAE 202 ADD A
Commissioning Process for Buildings and Systems
Year: 2017
Abstract: FOREWORD Addendum a to Standard 202-2013 changes the term “Commissioning Authority” to “Commissioning Provider” throughout the standard. Note: In this addendum, changes to the current standard are indicated in the text by (for additions) and strikethrough (for deletions) unless the instructions specifically mention some other means of indicating the changes.
-
Statistics
ASHRAE 202 ADD A
Show full item record
contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc | |
date accessioned | 2018-10-06T07:10:20Z | |
date available | 2018-10-06T07:10:20Z | |
date copyright | 2017.07.31 | |
date issued | 2017 | |
identifier other | DNARBGAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;jsessionid=435F2D89F77216F55ECC40BAF539160F/handle/yse/265113 | |
description abstract | FOREWORD Addendum a to Standard 202-2013 changes the term “Commissioning Authority” to “Commissioning Provider” throughout the standard. Note: In this addendum, changes to the current standard are indicated in the text by (for additions) and strikethrough (for deletions) unless the instructions specifically mention some other means of indicating the changes. | |
language | English | |
title | ASHRAE 202 ADD A | num |
title | Commissioning Process for Buildings and Systems | en |
type | standard | |
page | 6 | |
status | Active | |
tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc:;2017 | |
contenttype | fulltext |