• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASME/BPVC - ASME International (BPVC)
  • View Item
  •   YSE
  • Industrial Standards
  • ASME/BPVC - ASME International (BPVC)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASME/BPVC SEC III-NCA INT VOL 12

Interpretations Volume 12 - Section III-NCA

Organization:
ASME/BPVC - ASME International (BPVC)
Year: 1983

Abstract: This publication includes all of the written replies issued between the indicated dates by the ASME Staff on behalf of the ASME Boiler and Pressure Vessel Committee to inquiries concerning interpretations of the Boiler and Pressure Vessel Code. These interpretations are not a part of the Addenda or the Code.
These replies are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised reply, bearing the original Interpretation Number with the suffix R, is presented. Following these revised replies, new interpretations, and revisions to them issued during the same 6-month period, are assigned Interpretation Numbers in chronological order. Interpretations applying to more than one Code Section appear with the replies pertaining to each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not "approve," "certify," "rate," or "endorse" any item, construction, proprietary device, or activity.
These replies apply to the latest Edition and Addenda at the time of the inquiry or the Edition and Addenda stated in the reply. Subsequent revisions to the rules may have superseded the reply.
For detailed instructions on "Preparation of Technical Inquiries to the Boiler and Pressure Vessel Committee," refer to Mandatory Appendix XX.
URI: http://yse.yabesh.ir/std;query=authoCA5893FD081D20686159DD6E273C9FCD0Facilities%20Engineering%20Command%22/handle/yse/31799
Collections :
  • ASME/BPVC - ASME International (BPVC)
  • Download PDF : (1.541Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASME/BPVC SEC III-NCA INT VOL 12

Show full item record

contributor authorASME/BPVC - ASME International (BPVC)
date accessioned2017-09-04T15:30:24Z
date available2017-09-04T15:30:24Z
date copyright1983.07.01
date issued1983
identifier otherOAMZFBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD081D20686159DD6E273C9FCD0Facilities%20Engineering%20Command%22/handle/yse/31799
description abstractThis publication includes all of the written replies issued between the indicated dates by the ASME Staff on behalf of the ASME Boiler and Pressure Vessel Committee to inquiries concerning interpretations of the Boiler and Pressure Vessel Code. These interpretations are not a part of the Addenda or the Code.
These replies are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised reply, bearing the original Interpretation Number with the suffix R, is presented. Following these revised replies, new interpretations, and revisions to them issued during the same 6-month period, are assigned Interpretation Numbers in chronological order. Interpretations applying to more than one Code Section appear with the replies pertaining to each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not "approve," "certify," "rate," or "endorse" any item, construction, proprietary device, or activity.
These replies apply to the latest Edition and Addenda at the time of the inquiry or the Edition and Addenda stated in the reply. Subsequent revisions to the rules may have superseded the reply.
For detailed instructions on "Preparation of Technical Inquiries to the Boiler and Pressure Vessel Committee," refer to Mandatory Appendix XX.
languageEnglish
titleASME/BPVC SEC III-NCA INT VOL 12num
titleInterpretations Volume 12 - Section III-NCAen
typestandard
page42
statusActive
treeASME/BPVC - ASME International (BPVC):;1983
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian