• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • AIAA - American Institute of Aeronautics and Astronautics
  • View Item
  •   YSE
  • Industrial Standards
  • AIAA - American Institute of Aeronautics and Astronautics
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

AIAA R-092-1

Wind Tunnel Testing Part 1: Management Volume

Organization:
AIAA - American Institute of Aeronautics and Astronautics
Year: 2003

Abstract: Introduction
Wind tunnel testing is a critical component in the development of aerodynamic vehicles and associated technologies. While the time and expense of wind tunnel testing is significant, it is an essential risk reduction tool before progressing air vehicles and technologies to the more expensive, technically risky flight tests. Decisions made during the evolution and execution of wind tunnel test programs can have farreaching performance, financial, and schedule implications throughout the life cycle of an air vehicle.
Efforts are being made across all air vehicle development activities to reduce technical risk, cost, and cycle time. Since wind tunnel test programs are critical to those development activities, any successful reductions in wind tunnel risk, cost, or cycle time can have significant positive impacts on the overall air vehicle program.
To accomplish a successful program, managers of wind tunnel test programs must carefully balance the testing needs (objectives), schedules, and cost of the test program. Activities such as developing test requirements, test articles, test preparation, testing, and analysis require significant resource investments and must be carefully managed to accomplish technical goals with minimum resource expenditure.
This volume describes the broader aspects of test program development, implementation, and management. It provides managers with a set of tools (key activities) to help navigate and develop a balanced, successful test program.
URI: http://yse.yabesh.ir/std;jsessionid=5419487D58F372296210253C48C0B568/handle/yse/107078
Collections :
  • AIAA - American Institute of Aeronautics and Astronautics
  • Download PDF : (250.4Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    AIAA R-092-1

Show full item record

contributor authorAIAA - American Institute of Aeronautics and Astronautics
date accessioned2017-09-04T16:43:45Z
date available2017-09-04T16:43:45Z
date copyright2003.01.01
date issued2003
identifier otherBSQFEBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=5419487D58F372296210253C48C0B568/handle/yse/107078
description abstractIntroduction
Wind tunnel testing is a critical component in the development of aerodynamic vehicles and associated technologies. While the time and expense of wind tunnel testing is significant, it is an essential risk reduction tool before progressing air vehicles and technologies to the more expensive, technically risky flight tests. Decisions made during the evolution and execution of wind tunnel test programs can have farreaching performance, financial, and schedule implications throughout the life cycle of an air vehicle.
Efforts are being made across all air vehicle development activities to reduce technical risk, cost, and cycle time. Since wind tunnel test programs are critical to those development activities, any successful reductions in wind tunnel risk, cost, or cycle time can have significant positive impacts on the overall air vehicle program.
To accomplish a successful program, managers of wind tunnel test programs must carefully balance the testing needs (objectives), schedules, and cost of the test program. Activities such as developing test requirements, test articles, test preparation, testing, and analysis require significant resource investments and must be carefully managed to accomplish technical goals with minimum resource expenditure.
This volume describes the broader aspects of test program development, implementation, and management. It provides managers with a set of tools (key activities) to help navigate and develop a balanced, successful test program.
languageEnglish
titleAIAA R-092-1num
titleWind Tunnel Testing Part 1: Management Volumeen
typestandard
page23
statusActive
treeAIAA - American Institute of Aeronautics and Astronautics:;2003
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian