• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • SSC - Stennis Space Center
  • View Item
  •   YSE
  • Industrial Standards
  • SSC - Stennis Space Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

SSTD-8070-0009-CONFIG REV C-1

PREPARATION OF FORM SSC-625, CERTIFICATE OF COMPLETION (COC)

Organization:
SSC - Stennis Space Center
Year: 2012

Abstract: PURPOSE
This John C. Stennis Space Center (SSC) Standard (SSTD) establishes the requirements and procedures for completion and submittal of Certificate of Completion (COC), Form SSC-625, which is required for construction and renovation projects at SSC where any of the following conditions exist:
a. facilities baseline documentation is affected as referenced in SSTD-8070-0001-CONFIG,
b. facility value is increased by $5,000 or more
c. there is new or replacement vendor data, which is required for all jobs including shop work orders
d. project involves changes to breaker panels
APPLICABILITY
a. This SSTD applies to all SSC NASA organizations, resident agencies and contractors in accordance with the applicable requirements of SSTD-8070-0001-CONFIG.
b. This SSTD shall be maintained in accordance with SSTD-8070-0005-CONFIG.
c. Final authority for approval and interpretation of this SSTD resides with the NASA SSC Center Operations Directorate Project Management Division, and Operations and Maintenance Division.
URI: http://yse.yabesh.ir/std;jsessionid=5419487D58F372296210253C48C0B568/handle/yse/224187
Collections :
  • SSC - Stennis Space Center
  • Download PDF : (390.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    SSTD-8070-0009-CONFIG REV C-1

Show full item record

contributor authorSSC - Stennis Space Center
date accessioned2017-09-04T18:42:44Z
date available2017-09-04T18:42:44Z
date copyright03/05/2012
date issued2012
identifier otherKAEZFFAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=5419487D58F372296210253C48C0B568/handle/yse/224187
description abstractPURPOSE
This John C. Stennis Space Center (SSC) Standard (SSTD) establishes the requirements and procedures for completion and submittal of Certificate of Completion (COC), Form SSC-625, which is required for construction and renovation projects at SSC where any of the following conditions exist:
a. facilities baseline documentation is affected as referenced in SSTD-8070-0001-CONFIG,
b. facility value is increased by $5,000 or more
c. there is new or replacement vendor data, which is required for all jobs including shop work orders
d. project involves changes to breaker panels
APPLICABILITY
a. This SSTD applies to all SSC NASA organizations, resident agencies and contractors in accordance with the applicable requirements of SSTD-8070-0001-CONFIG.
b. This SSTD shall be maintained in accordance with SSTD-8070-0005-CONFIG.
c. Final authority for approval and interpretation of this SSTD resides with the NASA SSC Center Operations Directorate Project Management Division, and Operations and Maintenance Division.
languageEnglish
titleSSTD-8070-0009-CONFIG REV C-1num
titlePREPARATION OF FORM SSC-625, CERTIFICATE OF COMPLETION (COC)en
typestandard
page19
statusActive
treeSSC - Stennis Space Center:;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian