• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ISA - International Society of Automation
  • View Item
  •   YSE
  • Industrial Standards
  • ISA - International Society of Automation
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ISA RP77.60.05

Fossil Fuel Power Plant Human-Machine Interface Task Analysis

Organization:
ISA - International Society of Automation
Year: 2012

Abstract: Approaches are provided in this recommended practice for the application of task analysis during the conceptual design, preliminary design, and detailed design phases, as well as the test and evaluation of new control rooms/systems and control room upgrade/development programs. Although the relationship between task analysis and other system development techniques is briefly considered, the emphasis is clearly on the methods and benefits to be derived from a detailed analysis of operator functions and activities in the control room.
Methods used to support the task analysis are also presented. These include the use of surveys and questionnaires, tabletop analysis approaches, and the use of mockups and walkthroughs.
Applications of the data are considered for addressing a number of design-related issues. The discussion in this section will focus on the analysis of operator tasks, but could be extended to include maintainer tasks.
Purpose
The purpose of this document is to provide guidance and suggest an approach for conducting a task analysis as part of the design and development of new control rooms/systems for power plants and for supporting major control room upgrade programs. The basic premise is that task analysis data, when collected early, is beneficial throughout the design process and serves to identify instrumentation needs, assist in evaluating design options, and assist in validating completed designs for human-machine interface concerns.
This particular document is one of three parts. The reader is encouraged to consult the remaining two documents for additional information in performing integrated control room design. These documents are:
ISA-RP77.60.02-2000 (R2010), Fossil Fuel Power Plant Human-Machine Interface – Alarms
ISA-TR77.60.04-1996 (R2008), Fossil Fuel Power Plant Human-Machine Interface – Electronic Screen Displays
URI: http://yse.yabesh.ir/std;jsessionid=A33FFBB4A04818B251172099FA6814F7/handle/yse/208711
Collections :
  • ISA - International Society of Automation
  • Download PDF : (474.6Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ISA RP77.60.05

Show full item record

contributor authorISA - International Society of Automation
date accessioned2017-09-04T18:26:30Z
date available2017-09-04T18:26:30Z
date copyright11/12/2001 (R 2012)
date issued2012
identifier otherILRUUEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=A33FFBB4A04818B251172099FA6814F7/handle/yse/208711
description abstractApproaches are provided in this recommended practice for the application of task analysis during the conceptual design, preliminary design, and detailed design phases, as well as the test and evaluation of new control rooms/systems and control room upgrade/development programs. Although the relationship between task analysis and other system development techniques is briefly considered, the emphasis is clearly on the methods and benefits to be derived from a detailed analysis of operator functions and activities in the control room.
Methods used to support the task analysis are also presented. These include the use of surveys and questionnaires, tabletop analysis approaches, and the use of mockups and walkthroughs.
Applications of the data are considered for addressing a number of design-related issues. The discussion in this section will focus on the analysis of operator tasks, but could be extended to include maintainer tasks.
Purpose
The purpose of this document is to provide guidance and suggest an approach for conducting a task analysis as part of the design and development of new control rooms/systems for power plants and for supporting major control room upgrade programs. The basic premise is that task analysis data, when collected early, is beneficial throughout the design process and serves to identify instrumentation needs, assist in evaluating design options, and assist in validating completed designs for human-machine interface concerns.
This particular document is one of three parts. The reader is encouraged to consult the remaining two documents for additional information in performing integrated control room design. These documents are:
ISA-RP77.60.02-2000 (R2010), Fossil Fuel Power Plant Human-Machine Interface – Alarms
ISA-TR77.60.04-1996 (R2008), Fossil Fuel Power Plant Human-Machine Interface – Electronic Screen Displays
languageEnglish
titleISA RP77.60.05num
titleFossil Fuel Power Plant Human-Machine Interface Task Analysisen
typestandard
page22
statusActive
treeISA - International Society of Automation:;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian