ISA 62382
Automation Systems in the Process Industry − Electrical and Instrumentation Loop Check
Organization:
ISA - International Society of Automation
Year: 2012
Abstract: General applicability
This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
Collections
:
Show full item record
contributor author | ISA - International Society of Automation | |
date accessioned | 2017-09-04T15:57:51Z | |
date available | 2017-09-04T15:57:51Z | |
date copyright | 06/05/2012 | |
date issued | 2012 | |
identifier other | RBKOXEAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;jsessionid=A33FFBB4A04818B251172099FA6814F7/handle/yse/61103 | |
description abstract | General applicability This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). | |
language | English | |
title | ISA 62382 | num |
title | Automation Systems in the Process Industry − Electrical and Instrumentation Loop Check | en |
type | standard | |
page | 30 | |
status | Active | |
tree | ISA - International Society of Automation:;2012 | |
contenttype | fulltext |