• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • IEC - International Electrotechnical Commission
  • View Item
  •   YSE
  • Industrial Standards
  • IEC - International Electrotechnical Commission
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

English -- Industrial-process measurement, control and automation – Part 1: system interface between industrial facilities and the smart grid - Edition 1.0

IEC TS 62872-1

Organization:
IEC - International Electrotechnical Commission
Year: 2019

Abstract: Scope: This part of IEC 62872 defines the interface, in terms of information flow, between industrial facilities and the “smart grid”. It identifies, profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid. The scope of this document specifically excludes the protocols needed for the direct control of energy resources within a facility where the control and ultimate liability for such control is delegated by the industrial facility to the external entity (e.g. distributed energy resource (DER) control by the electrical grid operator).  
URI: http://yse.yabesh.ir/std;quein=autho162sAF6D081DAC4/handle/yse/288931
Collections :
  • IEC - International Electrotechnical Commission
  • Download PDF : (5.465Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    English -- Industrial-process measurement, control and automation – Part 1: system interface between industrial facilities and the smart grid - Edition 1.0

Show full item record

contributor authorIEC - International Electrotechnical Commission
date accessioned2020-09-15T22:27:59Z
date available2020-09-15T22:27:59Z
date copyright2019.06.01
date issued2019
identifier otherMKHEIGAAAAAAAAAA.pdf
identifier otherMKHEIGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;quein=autho162sAF6D081DAC4/handle/yse/288931
description abstractScope: This part of IEC 62872 defines the interface, in terms of information flow, between industrial facilities and the “smart grid”. It identifies, profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid. The scope of this document specifically excludes the protocols needed for the direct control of energy resources within a facility where the control and ultimate liability for such control is delegated by the industrial facility to the external entity (e.g. distributed energy resource (DER) control by the electrical grid operator).  
languageEnglish
titleEnglish -- Industrial-process measurement, control and automation – Part 1: system interface between industrial facilities and the smart grid - Edition 1.0en
titleIEC TS 62872-1num
typestandard
page106
statusActive
treeIEC - International Electrotechnical Commission:;2019
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian