• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA MPR 8060.2 REV J

NON-FLIGHT AND NON-FACILITY DESIGN AND DEVELOPMENT

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2008

Abstract: PURPOSE
This Marshall Procedural Requirements (MPR) defines the minimum procedural requirements for non-flight and non-facility design and development activities at the Marshall Space Flight Center (MSFC) and MSFC's Michoud Assembly Facility (MAF). Its implementation shall satisfy the requirements of MPD 1280.1, "Marshall Quality Management System Manual."
APPLICABILITY
This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFC's Michoud Assembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. ("Contractors," for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.)
This MPR shall be applicable to any non-flight and non-facility design and development activity:
That produces hardware or software that directly interfaces with flight hardware and is used for such purposes as testing, manufacturing, processing, and handling of the flight hardware; or
Where failure to ensure the quality of the output or product from that activity could adversely affect a critical mission objective such as the development or production of a piece of hardware or software or meeting a schedule milestone; or
When the project manager or requester requires the use of this MPR or requires the highest level of design and development control for the output or product produced from that activity.
In determining the applicability of this MPR to any activity, sound engineering rationale shall be employed by the design organization in the interpretation of P.2b. As an example, designs for manufacturing or development aids (such as alignment jigs, holding fixtures, electronic signal converters, and electronic checkout boxes) are excluded if the affected flight component subsequently undergoes sufficient test or inspection to find any errors introduced or overlooked by that aid.
The process for any design and development activity that does not meet the conditions of section P.2b shall be documented in an Organizational Issuance (OI) that satisfies the minimum design and development requirements set forth in section 7.8.1 of MPD 1280.1, "Marshall Quality Management System Manual" and ensures that appropriate and consistent practices are utilized and appropriate records of those practices are maintained.
This MPR shall be applicable to those activities addressed above commencing on or after this MPR's effective date.
URI: http://yse.yabesh.ir/std;query=autho1/handle/yse/176234
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (80.44Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA MPR 8060.2 REV J

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T17:53:02Z
date available2017-09-04T17:53:02Z
date copyright39791
date issued2008
identifier otherFDNCLCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho1/handle/yse/176234
description abstractPURPOSE
This Marshall Procedural Requirements (MPR) defines the minimum procedural requirements for non-flight and non-facility design and development activities at the Marshall Space Flight Center (MSFC) and MSFC's Michoud Assembly Facility (MAF). Its implementation shall satisfy the requirements of MPD 1280.1, "Marshall Quality Management System Manual."
APPLICABILITY
This MPR applies to the personnel, programs, projects, and activities at MSFC and MSFC's Michoud Assembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. ("Contractors," for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.)
This MPR shall be applicable to any non-flight and non-facility design and development activity:
That produces hardware or software that directly interfaces with flight hardware and is used for such purposes as testing, manufacturing, processing, and handling of the flight hardware; or
Where failure to ensure the quality of the output or product from that activity could adversely affect a critical mission objective such as the development or production of a piece of hardware or software or meeting a schedule milestone; or
When the project manager or requester requires the use of this MPR or requires the highest level of design and development control for the output or product produced from that activity.
In determining the applicability of this MPR to any activity, sound engineering rationale shall be employed by the design organization in the interpretation of P.2b. As an example, designs for manufacturing or development aids (such as alignment jigs, holding fixtures, electronic signal converters, and electronic checkout boxes) are excluded if the affected flight component subsequently undergoes sufficient test or inspection to find any errors introduced or overlooked by that aid.
The process for any design and development activity that does not meet the conditions of section P.2b shall be documented in an Organizational Issuance (OI) that satisfies the minimum design and development requirements set forth in section 7.8.1 of MPD 1280.1, "Marshall Quality Management System Manual" and ensures that appropriate and consistent practices are utilized and appropriate records of those practices are maintained.
This MPR shall be applicable to those activities addressed above commencing on or after this MPR's effective date.
languageEnglish
titleNASA MPR 8060.2 REV Jnum
titleNON-FLIGHT AND NON-FACILITY DESIGN AND DEVELOPMENTen
typestandard
page18
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2008
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian