• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • GSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • GSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA GPR 8834.1 REV A

Lifting Operations Requirements

Organization:
GSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
Year: 2008

Abstract: PURPOSE
The purpose of this GPR is to define the process, requirements, and responsibilities for conducting safe lifting operations at Goddard Space Flight Center (GSFC).
APPLICABILITY
This directive is applicable to all operations associated with Lifting Devices and Equipment (LDE), including rented or leased LDE, at Greenbelt, Wallops Flight Facility (WFF), and other areas under GSFC cognizance unless specifically excluded by this directive. It also applies to institutional lifts and manual lifts.
This directive does not apply to tenants and their contract personnel operating in facilities exclusively used for non-NASA operations and controlled by the tenant under a Center-level agreement.
This directive does not apply to contractor lifting operations on-site using contractor-provided LDE which are exclusively associated with facility or equipment repair, maintenance, modification, installation, removal, or construction activities, unless documented in relevant contracts. When there is risk to NASA personnel, facilities, or equipment, procuring organizations shall require the contractor to submit a safety plan that describes the lifting operations and procedures, the OSHA standards to be followed, and other special analyses or safeguards needed. Procuring organizations shall ensure the approved safety plan becomes part of the contract.
URI: http://yse.yabesh.ir/std;query=autho18267D83FCDCAC426159DD6EFDEC9FCD/handle/yse/209424
Collections :
  • GSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
  • Download PDF : (98.04Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA GPR 8834.1 REV A

Show full item record

contributor authorGSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
date accessioned2017-09-04T18:27:17Z
date available2017-09-04T18:27:17Z
date copyright02/04/2008
date issued2008
identifier otherINMMCCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho18267D83FCDCAC426159DD6EFDEC9FCD/handle/yse/209424
description abstractPURPOSE
The purpose of this GPR is to define the process, requirements, and responsibilities for conducting safe lifting operations at Goddard Space Flight Center (GSFC).
APPLICABILITY
This directive is applicable to all operations associated with Lifting Devices and Equipment (LDE), including rented or leased LDE, at Greenbelt, Wallops Flight Facility (WFF), and other areas under GSFC cognizance unless specifically excluded by this directive. It also applies to institutional lifts and manual lifts.
This directive does not apply to tenants and their contract personnel operating in facilities exclusively used for non-NASA operations and controlled by the tenant under a Center-level agreement.
This directive does not apply to contractor lifting operations on-site using contractor-provided LDE which are exclusively associated with facility or equipment repair, maintenance, modification, installation, removal, or construction activities, unless documented in relevant contracts. When there is risk to NASA personnel, facilities, or equipment, procuring organizations shall require the contractor to submit a safety plan that describes the lifting operations and procedures, the OSHA standards to be followed, and other special analyses or safeguards needed. Procuring organizations shall ensure the approved safety plan becomes part of the contract.
languageEnglish
titleNASA GPR 8834.1 REV Anum
titleLifting Operations Requirementsen
typestandard
page20
statusActive
treeGSFC - NASA - GSFC - Robert H. Goddard Space Flight Center:;2008
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian