Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
ASHRAE GUIDELINE 1.2 ERTA
Year: 2019
Abstract: The corrections listed in this errata sheet apply to all copies of ASHRAE Guideline 1.2- 2019.
The first printing is identified as “Product code: 86862 1/19 on the outside back cover.
-
Statistics
Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
Show full item record
contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. | |
date accessioned | 2020-07-27T20:51:00Z | |
date available | 2020-07-27T20:51:00Z | |
date issued | 2019 | |
identifier other | TVZLKGAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho162/handle/yse/280365 | |
description abstract | The corrections listed in this errata sheet apply to all copies of ASHRAE Guideline 1.2- 2019. The first printing is identified as “Product code: 86862 1/19 on the outside back cover. | |
language | English | |
title | Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies | en |
title | ASHRAE GUIDELINE 1.2 ERTA | num |
type | standard | |
page | 1 | |
status | Active | |
tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019 | |
contenttype | fulltext |