Show simple item record

ASHRAE 188 INT 1

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2020-07-27T20:51:04Z
date available2020-07-27T20:51:04Z
date issued2019
identifier otherQRYBJGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho162/handle/yse/280383
description abstractMichael Gammill, 202 N Edison Street, Bixby, OK 74008. This request for interpretation refers to the requirements presented in ANSI/ASHRAE Standard 188-2018, Section A2.1, relating to Designated Team. ANSI/ASHRAE Standard 188-2018 Section A2.1 states or would imply that a member of the designated team member within the United States should include someone who is an infection preventionist certified in infection prevention and control (CIC certification) by the Certification Board of Infection Control and Epidemiology (CBIC) or who is an epidemiologist with a minimum of a master’s degree.
languageEnglish
titleLegionellosis: Risk Management for building Water Systemsen
titleASHRAE 188 INT 1num
typestandard
page1
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record