Abstract: This guideline applies to the procedures, methods, and documentation requirements for each phase of the Commissioning (Cx) Process applied to existing HVAC&R systems and assemblies, including:
a.
Development of facility goals and Current Facility Requirements (CFR)
b.
Discovery and evaluation of available documentation for existing HVAC&R systems
c.
Evaluation of the condition of existing HVAC&R systems
d.
Development of a prioritized Cx Plan, including schedule and budget estimates
e.
Development of recommendations
f.
Implementation of recommendations
g.
Verification of completed recommendations
h.
Development of Systems Manual
i.
Training of facility personnel
j.
Development of Cx Reports
k.
Ongoing commissioning (OCx) activities
This guideline focuses on the following:
a.
Energy use
b.
Operations and Maintenance (O&M)
c.
Indoor Environmental Quality (IEQ)
PURPOSE
The purpose of this guideline is to provide requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies
-
Statistics
Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
Show full item record
contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. | |
date accessioned | 2020-07-27T20:51:14Z | |
date available | 2020-07-27T20:51:14Z | |
date issued | 2019 | |
identifier other | PTZAHGAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho162/handle/yse/280416 | |
description abstract | This guideline applies to the procedures, methods, and documentation requirements for each phase of the Commissioning (Cx) Process applied to existing HVAC&R systems and assemblies, including: a. Development of facility goals and Current Facility Requirements (CFR) b. Discovery and evaluation of available documentation for existing HVAC&R systems c. Evaluation of the condition of existing HVAC&R systems d. Development of a prioritized Cx Plan, including schedule and budget estimates e. Development of recommendations f. Implementation of recommendations g. Verification of completed recommendations h. Development of Systems Manual i. Training of facility personnel j. Development of Cx Reports k. Ongoing commissioning (OCx) activities This guideline focuses on the following: a. Energy use b. Operations and Maintenance (O&M) c. Indoor Environmental Quality (IEQ) PURPOSE The purpose of this guideline is to provide requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies | |
language | English | |
title | Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies | en |
title | ASHRAE GUIDELINE 1.2 | num |
type | standard | |
page | 74 | |
status | Active | |
tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019 | |
contenttype | fulltext |