Show simple item record

ASHRAE GUIDELINE 0

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2020-07-27T20:51:20Z
date available2020-07-27T20:51:20Z
date issued2019
identifier otherKCMGIGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho162/handle/yse/280434
description abstractThe procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from predesign through occupancy and operation, without regard to specific elements, assemblies, or systems. This guideline provides the following: a. Overview of Commissioning Process Activities b. Description of the Commissioning Processes for each project phase c. Requirements for acceptance during each phase d. Requirements for documentation during each phase e. Requirements for training of operations and maintenance (O&M) personnel PURPOSE The purpose of this guideline is to describe a Commissioning Process (Cx) capable of verifying that the facility and its systems meet the Owner’s Project Requirements (OPR)
languageEnglish
titleThe Commissioning Process - Includes ASHRAE addenda listed in Appendix Qen
titleASHRAE GUIDELINE 0num
typestandard
page66
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record