The Commissioning Process - Includes ASHRAE addenda listed in Appendix Q
ASHRAE GUIDELINE 0
Year: 2019
Abstract: The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from predesign through occupancy and operation, without regard to specific elements, assemblies, or systems.
This guideline provides the following:
a.
Overview of Commissioning Process Activities
b.
Description of the Commissioning Processes for each project phase
c.
Requirements for acceptance during each phase
d.
Requirements for documentation during each phase
e.
Requirements for training of operations and maintenance (O&M) personnel
PURPOSE
The purpose of this guideline is to describe a Commissioning Process (Cx) capable of verifying that the facility and its systems meet the Owner’s Project Requirements (OPR)
-
Statistics
The Commissioning Process - Includes ASHRAE addenda listed in Appendix Q
Show full item record
contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. | |
date accessioned | 2020-07-27T20:51:20Z | |
date available | 2020-07-27T20:51:20Z | |
date issued | 2019 | |
identifier other | KCMGIGAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho162/handle/yse/280434 | |
description abstract | The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from predesign through occupancy and operation, without regard to specific elements, assemblies, or systems. This guideline provides the following: a. Overview of Commissioning Process Activities b. Description of the Commissioning Processes for each project phase c. Requirements for acceptance during each phase d. Requirements for documentation during each phase e. Requirements for training of operations and maintenance (O&M) personnel PURPOSE The purpose of this guideline is to describe a Commissioning Process (Cx) capable of verifying that the facility and its systems meet the Owner’s Project Requirements (OPR) | |
language | English | |
title | The Commissioning Process - Includes ASHRAE addenda listed in Appendix Q | en |
title | ASHRAE GUIDELINE 0 | num |
type | standard | |
page | 66 | |
status | Active | |
tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019 | |
contenttype | fulltext |