• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • NACE - NACE International
  • View Item
  •   YSE
  • Industrial Standards
  • NACE - NACE International
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NACE SP0288

Inspection of Lining Application in Steel and Concrete Equipment - Item No. 21039

Organization:
NACE - NACE International
Year: 2011

Abstract: General
This standard practice provides inspection requirements to verify compliance to a specification for application of a lining in steel or concrete equipment such as tanks, vessels, sumps, and basins.
This standard is applicable to the application of a new or replacement lining, but is not applicable to the routine inspection of an existing lining.
This standard does not address the selection of the lining material(s) or specify surface preparation and lining application requirements.
This standard does not apply to inspection of exterior coatings on steel or concrete such as atmospheric coatings or external coatings on pipelines or other buried or submerged structures.
Successful lining application is usually the result of a well-prepared lining application specification, properly selected highquality lining materials, a competent, experienced, knowledgeable lining applicator, and an inspector knowledgeable, and preferably certified, in lining inspection procedures. Adherence to a well-prepared lining application specification that clearly details industry-accepted requirements and procedures for quality lining application should result in a satisfactory application. The inspector relies on a well-prepared lining application specification, which should include methods, specification standards, and acceptance criteria.
Specifications should be written with the purpose of designating materials and methods that result in high-quality linings appropriate for the user. Attention must be given to relevant details in a lining application specification. The specification should refer to industry standards whenever possible to minimize confusion or disputes over methodology and to reflect the latest technology that satisfies engineering and design principles for a particular application and environment. The specifications should include the acceptance criteria for the owner/user.
Inspectors shall have previously performed the functions outlined in this standard and be proficient in the use of inspection equipment. When required, inspectors shall provide necessary documentation and evidence demonstrating suitable qualifications.
The inspector shall maintain a detailed report that outlines observations and measurements of surface preparation, ambient conditions, mixing techniques, application procedures, curing, final inspection, and other information requested at the prejob conference.
When agreed to by the owner, an inspector shall have the authority to suspend lining application work if the work being performed is not in accordance with the lining application specification. Inspector responsibility and authority shall be agreed on by the owner and the contractor.
URI: http://yse.yabesh.ir/std;query=autho162sAF679D4049A961598F1EFDEC014A0Facilities%114ngineering%20Command%22/handle/yse/85557
Collections :
  • NACE - NACE International
  • Download PDF : (184.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NACE SP0288

Show full item record

contributor authorNACE - NACE International
date accessioned2017-09-04T16:22:13Z
date available2017-09-04T16:22:13Z
date copyright40844
date issued2011
identifier otherBMPNUEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho162sAF679D4049A961598F1EFDEC014A0Facilities%114ngineering%20Command%22/handle/yse/85557
description abstractGeneral
This standard practice provides inspection requirements to verify compliance to a specification for application of a lining in steel or concrete equipment such as tanks, vessels, sumps, and basins.
This standard is applicable to the application of a new or replacement lining, but is not applicable to the routine inspection of an existing lining.
This standard does not address the selection of the lining material(s) or specify surface preparation and lining application requirements.
This standard does not apply to inspection of exterior coatings on steel or concrete such as atmospheric coatings or external coatings on pipelines or other buried or submerged structures.
Successful lining application is usually the result of a well-prepared lining application specification, properly selected highquality lining materials, a competent, experienced, knowledgeable lining applicator, and an inspector knowledgeable, and preferably certified, in lining inspection procedures. Adherence to a well-prepared lining application specification that clearly details industry-accepted requirements and procedures for quality lining application should result in a satisfactory application. The inspector relies on a well-prepared lining application specification, which should include methods, specification standards, and acceptance criteria.
Specifications should be written with the purpose of designating materials and methods that result in high-quality linings appropriate for the user. Attention must be given to relevant details in a lining application specification. The specification should refer to industry standards whenever possible to minimize confusion or disputes over methodology and to reflect the latest technology that satisfies engineering and design principles for a particular application and environment. The specifications should include the acceptance criteria for the owner/user.
Inspectors shall have previously performed the functions outlined in this standard and be proficient in the use of inspection equipment. When required, inspectors shall provide necessary documentation and evidence demonstrating suitable qualifications.
The inspector shall maintain a detailed report that outlines observations and measurements of surface preparation, ambient conditions, mixing techniques, application procedures, curing, final inspection, and other information requested at the prejob conference.
When agreed to by the owner, an inspector shall have the authority to suspend lining application work if the work being performed is not in accordance with the lining application specification. Inspector responsibility and authority shall be agreed on by the owner and the contractor.
languageEnglish
titleNACE SP0288num
titleInspection of Lining Application in Steel and Concrete Equipment - Item No. 21039en
typestandard
page12
statusActive
treeNACE - NACE International:;2011
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian