NASA-LLIS-1717
Lessons Learned – Process Control of Floor Level Procedures
Year: 2006
Abstract: Abstract:
Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation.
Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation.
Subject: Additional Categories.
Show full item record
contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
date accessioned | 2017-09-04T18:36:44Z | |
date available | 2017-09-04T18:36:44Z | |
date copyright | 03/14/2006 | |
date issued | 2006 | |
identifier other | JLYCQCAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho47037D83081DAC4261598F1EFDEC014A/handle/yse/218722 | |
description abstract | Abstract: Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation. | |
language | English | |
title | NASA-LLIS-1717 | num |
title | Lessons Learned – Process Control of Floor Level Procedures | en |
type | standard | |
page | 3 | |
status | Active | |
tree | NASA - National Aeronautics and Space Administration (NASA):;2006 | |
contenttype | fulltext | |
subject keywords | Additional Categories. | |
subject keywords | Additional Categories.Configuration Management | |
subject keywords | Additional Categories.Energy | |
subject keywords | Additional Categories.Facilities | |
subject keywords | Additional Categories.Industrial Operations | |
subject keywords | Additional Categories.Policy & Planning | |
subject keywords | Manufacturing and Assembly | |
subject keywords | Program Management.Communications between different offices and contractor personnel |