MIL-DTL-50911B
PRIMING ASSEMBLY FOR DEMOLITION CHARGE ASSEMBLY: M183 PARTS FOR AND LOADING, ASSEMBLING AND PACKING
Year: 2011
Abstract: This specification prescribes the requirements and identifies the verification methods for the Priming Assembly for Demolition Charge Assembly: M183 Parts For and Loading, Assembling and Packing.Intended Use: The Priming Assembly is used to initiate all past and current fielded and developmental demolition items such as explosives, shaped charges, and cratering charges.
Subject: C4 block
Show full item record
contributor author | ARMY - AR - US Army Research Devlp & Engr Command, Armament Research Devlp & Engr Center | |
date accessioned | 2017-09-04T18:25:49Z | |
date available | 2017-09-04T18:25:49Z | |
date copyright | 01/07/2011 | |
date issued | 2011 | |
identifier other | IJTFPDAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho47037D83081DAC426159DD6EFDEC014A/handle/yse/207988 | |
description abstract | This specification prescribes the requirements and identifies the verification methods for the Priming Assembly for Demolition Charge Assembly: M183 Parts For and Loading, Assembling and Packing.Intended Use: The Priming Assembly is used to initiate all past and current fielded and developmental demolition items such as explosives, shaped charges, and cratering charges. | |
language | English | |
title | MIL-DTL-50911B | num |
title | PRIMING ASSEMBLY FOR DEMOLITION CHARGE ASSEMBLY: M183 PARTS FOR AND LOADING, ASSEMBLING AND PACKING | en |
type | standard | |
page | 13 | |
status | Active | |
tree | ARMY - AR - US Army Research Devlp & Engr Command, Armament Research Devlp & Engr Center:;2011 | |
contenttype | fulltext | |
subject keywords | C4 block | |
subject keywords | Composition C4 | |
subject keywords | Det Cord |