• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

MSFC-PLAN-2789 REV C CHG NOTICE 3

CONFIGURATION MANAGEMENT PLAN FOR DYNAMICALLY CONTROLLED PROTEIN CRYSTAL GROWTH (DCPCG)

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2001

Abstract: The Dynamically Controlled Protein Crystal Growth (DCPCG) Configuration Management Plan defines requirements, responsibilities, and procedures for the configuration management (CM) system which will be applied to the Marshall Space Flight Center (MSFC) DCPCG project, and baselines controlled by the DCPCG Level III Configuration Control Board (CCB).
URI: http://yse.yabesh.ir/std;query=autho54037D83FCDC527361598F1ED52F014A/handle/yse/221040
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (965.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    MSFC-PLAN-2789 REV C CHG NOTICE 3

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T18:39:22Z
date available2017-09-04T18:39:22Z
date copyright37181
date issued2001
identifier otherJRYGFBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho54037D83FCDC527361598F1ED52F014A/handle/yse/221040
description abstractThe Dynamically Controlled Protein Crystal Growth (DCPCG) Configuration Management Plan defines requirements, responsibilities, and procedures for the configuration management (CM) system which will be applied to the Marshall Space Flight Center (MSFC) DCPCG project, and baselines controlled by the DCPCG Level III Configuration Control Board (CCB).
languageEnglish
titleMSFC-PLAN-2789 REV C CHG NOTICE 3num
titleCONFIGURATION MANAGEMENT PLAN FOR DYNAMICALLY CONTROLLED PROTEIN CRYSTAL GROWTH (DCPCG)en
typestandard
page21
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2001
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian