• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1033

Lessons Learned – Controlling Risk on Cost-Capped, Schedule-Driven, Technology Validation Projects (1998)

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2001

Abstract: Abstract:
Deep Space 1 (DS1) was a cost-capped, schedule-driven, technology validation project, designed to flight validate 12 advanced technologies that represented major breakthroughs over state-of-the-art systems. DS1 exceeded its mission success criteria, both in terms of technology demonstration and mission duration.
The lesson lists 7 recommendations/success criteria for high risk, cost capped missions.
URI: http://yse.yabesh.ir/std;query=authoCA5893FD081D49A96159DD6EFDEC014A/handle/yse/218663
Subject: Autonomous Navigation
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (17.53Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1033

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:36:41Z
date available2017-09-04T18:36:41Z
date copyright01/01/2001
date issued2001
identifier otherJLUEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD081D49A96159DD6EFDEC014A/handle/yse/218663
description abstractAbstract:
Deep Space 1 (DS1) was a cost-capped, schedule-driven, technology validation project, designed to flight validate 12 advanced technologies that represented major breakthroughs over state-of-the-art systems. DS1 exceeded its mission success criteria, both in terms of technology demonstration and mission duration.
The lesson lists 7 recommendations/success criteria for high risk, cost capped missions.
languageEnglish
titleNASA-LLIS-1033num
titleLessons Learned – Controlling Risk on Cost-Capped, Schedule-Driven, Technology Validation Projects (1998)en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2001
contenttypefulltext
subject keywordsAutonomous Navigation
subject keywordsExternal Relations
subject keywordsFlight Qualification
subject keywordsManagement and Planning
subject keywordsPayloads
subject keywordsPolicy & Planning
subject keywordsProcurement Small Business & Industrial Relations
subject keywordsRisk Management/Assessment
subject keywordsSafety & Mission Assurance
subject keywordsTechnology Plan
subject keywordsTechnology Readiness Level
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian