• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0749

Lessons Learned – Facilities, Mod/Rehab Projects, Construction Mtgs

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1999

Abstract: Description of Driving Event:
Building Rehab projects are typically done on the second shift (4:00 p.m.-12:00 a.m.) and construction meetings are held every week to discuss the progress of the job. These meeting times and dates are left up to the participants to determine. The contract requires the meeting, but does not dictate a specific time.
The Contractor's job superintendent doesn't start work until 4:00 p.m. and when construction meetings start at 3:00 p.m. some valuable input from the field is missing. The Contractor's Project Manager is always in attendance, however the field representation is also required. If the meetings were moved until 4:00 p.m., many of the Government's representatives would not be in attendance due to their work schedule.
URI: http://yse.yabesh.ir/std;query=authoCA5893FD081D49A96159DD6EFDEC014A/handle/yse/221848
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.97Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0749

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:40:09Z
date available2017-09-04T18:40:09Z
date copyright08/23/1999
date issued1999
identifier otherJUCEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD081D49A96159DD6EFDEC014A/handle/yse/221848
description abstractDescription of Driving Event:
Building Rehab projects are typically done on the second shift (4:00 p.m.-12:00 a.m.) and construction meetings are held every week to discuss the progress of the job. These meeting times and dates are left up to the participants to determine. The contract requires the meeting, but does not dictate a specific time.
The Contractor's job superintendent doesn't start work until 4:00 p.m. and when construction meetings start at 3:00 p.m. some valuable input from the field is missing. The Contractor's Project Manager is always in attendance, however the field representation is also required. If the meetings were moved until 4:00 p.m., many of the Government's representatives would not be in attendance due to their work schedule.
languageEnglish
titleNASA-LLIS-0749num
titleLessons Learned – Facilities, Mod/Rehab Projects, Construction Mtgsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1999
contenttypefulltext
subject keywordsFacilities
subject keywordsLogistics
subject keywordsProcurement Small Business & Industrial Relations
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian