• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

ASHRAE GUIDELINE 1.2

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2019

Abstract: This guideline applies to the procedures, methods, and documentation requirements for each phase of the Commissioning (Cx) Process applied to existing HVAC&R systems and assemblies, including: a. Development of facility goals and Current Facility Requirements (CFR) b. Discovery and evaluation of available documentation for existing HVAC&R systems c. Evaluation of the condition of existing HVAC&R systems d. Development of a prioritized Cx Plan, including schedule and budget estimates e. Development of recommendations f. Implementation of recommendations g. Verification of completed recommendations h. Development of Systems Manual i. Training of facility personnel j. Development of Cx Reports k. Ongoing commissioning (OCx) activities This guideline focuses on the following: a. Energy use b. Operations and Maintenance (O&M) c. Indoor Environmental Quality (IEQ) PURPOSE The purpose of this guideline is to provide requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies
URI: http://yse.yabesh.ir/std;query=authoCA5893FD69B749A96159DD6E273C9FCD0Facilities%20Engineering%20Command%226EFDEC9/handle/yse/280416
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (1.174Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2020-07-27T20:51:14Z
date available2020-07-27T20:51:14Z
date issued2019
identifier otherPTZAHGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD69B749A96159DD6E273C9FCD0Facilities%20Engineering%20Command%226EFDEC9/handle/yse/280416
description abstractThis guideline applies to the procedures, methods, and documentation requirements for each phase of the Commissioning (Cx) Process applied to existing HVAC&R systems and assemblies, including: a. Development of facility goals and Current Facility Requirements (CFR) b. Discovery and evaluation of available documentation for existing HVAC&R systems c. Evaluation of the condition of existing HVAC&R systems d. Development of a prioritized Cx Plan, including schedule and budget estimates e. Development of recommendations f. Implementation of recommendations g. Verification of completed recommendations h. Development of Systems Manual i. Training of facility personnel j. Development of Cx Reports k. Ongoing commissioning (OCx) activities This guideline focuses on the following: a. Energy use b. Operations and Maintenance (O&M) c. Indoor Environmental Quality (IEQ) PURPOSE The purpose of this guideline is to provide requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies
languageEnglish
titleTechnical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assembliesen
titleASHRAE GUIDELINE 1.2num
typestandard
page74
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian