• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

The Commissioning Process - Includes ASHRAE addenda listed in Appendix Q

ASHRAE GUIDELINE 0

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2019

Abstract: The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from predesign through occupancy and operation, without regard to specific elements, assemblies, or systems. This guideline provides the following: a. Overview of Commissioning Process Activities b. Description of the Commissioning Processes for each project phase c. Requirements for acceptance during each phase d. Requirements for documentation during each phase e. Requirements for training of operations and maintenance (O&M) personnel PURPOSE The purpose of this guideline is to describe a Commissioning Process (Cx) capable of verifying that the facility and its systems meet the Owner’s Project Requirements (OPR)
URI: http://yse.yabesh.ir/std;query=authoCA5893FD69B749A96159DD6E273C9FCD0Facilities%20Engineering%20Command%226EFDEC9/handle/yse/280434
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (533.3Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    The Commissioning Process - Includes ASHRAE addenda listed in Appendix Q

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2020-07-27T20:51:20Z
date available2020-07-27T20:51:20Z
date issued2019
identifier otherKCMGIGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD69B749A96159DD6E273C9FCD0Facilities%20Engineering%20Command%226EFDEC9/handle/yse/280434
description abstractThe procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from predesign through occupancy and operation, without regard to specific elements, assemblies, or systems. This guideline provides the following: a. Overview of Commissioning Process Activities b. Description of the Commissioning Processes for each project phase c. Requirements for acceptance during each phase d. Requirements for documentation during each phase e. Requirements for training of operations and maintenance (O&M) personnel PURPOSE The purpose of this guideline is to describe a Commissioning Process (Cx) capable of verifying that the facility and its systems meet the Owner’s Project Requirements (OPR)
languageEnglish
titleThe Commissioning Process - Includes ASHRAE addenda listed in Appendix Qen
titleASHRAE GUIDELINE 0num
typestandard
page66
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2019
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian