Abstract: INTRODUCTION TO THE COMMISSIONING PROCESS
This chapter serves as a high-level strategic commissioning description that provides stakeholders with a basis for understanding enhanced delivery of new and existing building projects.
It describes the value, benefits, and rationale for verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner’s Project Requirements (OPR) for new construction and/or major renovations.
This guide is intended to establish and maintain consistent high-level commissioning goals and objectives, including performance, cost-effectiveness, consistency, and best practices.
Commissioning can be applied to nearly all building systems and equipment
-
Statistics
Commissioning Stakeholders’ Guide
Show full item record
contributor author | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. | |
date accessioned | 2020-07-27T20:51:24Z | |
date available | 2020-07-27T20:51:24Z | |
date issued | 2018 | |
identifier other | MQMWGGAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=authoCA5893FD69B749A96159DD6E273C9FCD0Facilities%20Engineering%20Command%226EFDEC9/handle/yse/280442 | |
description abstract | INTRODUCTION TO THE COMMISSIONING PROCESS This chapter serves as a high-level strategic commissioning description that provides stakeholders with a basis for understanding enhanced delivery of new and existing building projects. It describes the value, benefits, and rationale for verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner’s Project Requirements (OPR) for new construction and/or major renovations. This guide is intended to establish and maintain consistent high-level commissioning goals and objectives, including performance, cost-effectiveness, consistency, and best practices. Commissioning can be applied to nearly all building systems and equipment | |
language | English | |
title | Commissioning Stakeholders’ Guide | en |
title | ASHRAE 90307 | num |
type | standard | |
page | 122 | |
status | Active | |
tree | ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2018 | |
contenttype | fulltext |