• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

MSFC-PLAN-3399

DELTA-L RISK MANAGEMENT PLAN

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2003

Abstract: The DELTA-L Risk Management Plan complies with the intent of NASA Policy Plan (NPG) 7120.5A and Marshall Work Instruction (MWI) 7120.6. It is the intent of these documents to start risk management planning at the formulation phase of a project and continue throughout the life of the project. New hardware will be developed for DELTA-L and Risk management for DELTA-L will address this new hardware and software and preparations associated with flight.
This Plan covers building new hardware, software and preparation for flight for the entire DELTA-L system which includes the following;
a experiment growth cells
b Fluidics
c internal/external interfaces
d DELTA-L systems and subsystems
e software
f Hardware
g Thermal Control
h electronics/C&DH
i Imaging System
j Vibration Isolation
Purpose
The purpose of the DELTA-L Risk Management Plan which resides in the e-PORT database, is to provide a tool for the project team explaining risk management responsibilities, methodologies and processes to be used for DELTA-L risk identification, assessment, analysis and mitigation. A database has been constructed for tracking risks identified by team members, and this document is a guide for understanding and using this database. The database provides a risk status matrix which identifies risk priority, a description of the risk (risk statement), a closeout method, responsible personnel, due date and status. This matrix will also serve as a tool for the project manager in providing an instant status report to higher management on short notice.
The intent of this Plan is to help the project produce a quality product within programmatic schedule and cost constraints. This Plan is for use in conjunction with the risk management requirements specified in paragraph 14.0 of the DELTA-L Project Plan, MSFC-PLAN-3107. This Plan applies to internal and external risks for DELTA-L.
URI: http://yse.yabesh.ir/std;query=authoCA5893FD69B7ds6/handle/yse/163105
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (618.1Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    MSFC-PLAN-3399

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T17:40:04Z
date available2017-09-04T17:40:04Z
date copyright37966
date issued2003
identifier otherDULEIBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD69B7ds6/handle/yse/163105
description abstractThe DELTA-L Risk Management Plan complies with the intent of NASA Policy Plan (NPG) 7120.5A and Marshall Work Instruction (MWI) 7120.6. It is the intent of these documents to start risk management planning at the formulation phase of a project and continue throughout the life of the project. New hardware will be developed for DELTA-L and Risk management for DELTA-L will address this new hardware and software and preparations associated with flight.
This Plan covers building new hardware, software and preparation for flight for the entire DELTA-L system which includes the following;
a experiment growth cells
b Fluidics
c internal/external interfaces
d DELTA-L systems and subsystems
e software
f Hardware
g Thermal Control
h electronics/C&DH
i Imaging System
j Vibration Isolation
Purpose
The purpose of the DELTA-L Risk Management Plan which resides in the e-PORT database, is to provide a tool for the project team explaining risk management responsibilities, methodologies and processes to be used for DELTA-L risk identification, assessment, analysis and mitigation. A database has been constructed for tracking risks identified by team members, and this document is a guide for understanding and using this database. The database provides a risk status matrix which identifies risk priority, a description of the risk (risk statement), a closeout method, responsible personnel, due date and status. This matrix will also serve as a tool for the project manager in providing an instant status report to higher management on short notice.
The intent of this Plan is to help the project produce a quality product within programmatic schedule and cost constraints. This Plan is for use in conjunction with the risk management requirements specified in paragraph 14.0 of the DELTA-L Project Plan, MSFC-PLAN-3107. This Plan applies to internal and external risks for DELTA-L.
languageEnglish
titleMSFC-PLAN-3399num
titleDELTA-L RISK MANAGEMENT PLANen
typestandard
page21
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2003
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian