• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  •   YSE
  • Defence Standards
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

MSFC-PLAN-2784 REV C

REGENERATIVE ECLSS PROJECT CONFIGURATION MANAGEMENT PLAN

Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2005

Abstract: The MSFC Regenerative Environmental Control and Life Support System (ECLSS) Project Configuration Management Plan defines requirements, responsibilities, and procedures for the configuration management (CM) system which shall be applied to the Regenerative ECLSS development and integration activities at MSFC. The Regenerative ECLSS Project shall control the Regenerative ECLSS project baseline documentation under one Configuration Control Board (CCB) with the following projects as membership:
 Project Name                                                              Project Code   Regenerative Environmental Control and Life Support System (ECLSS)        SL3-00  Water Recovery System (WRS) (Includes Urine Processor Assembly) Project   WR3-00  Oxygen Generator Assembly (OGS) (Includes Power Supply Module) Project    OS3-00  Vapor Compression Distillation Flight Experiment (VCD FE) Project         CD3-00  Portable Fan Assembly (PFA) Project                                       PF3-00  Manual Pressure Equalization Valve Sampling Adapter (MPEV SA) Project     IT3-00  Volatile Removal Assembly Flight Experiment (VRA FE) Project              RA3-00


The MSFC Regenerative ECLSS Projects shall identify configurations by baselining technical documentation at progressive project milestones. Through this baselining process, the Projects shall progress the hardware/software baseline from requirements to detail design to hardware/software products. The projects shall control changes to the baseline through the CM System described in this plan.
This plan complies with MPR 8040.1, SSP 41170, and SSP 50123.
URI: http://yse.yabesh.ir/std;query=authoCA5893FD69B7ds6/handle/yse/176860
Collections :
  • MSFC - NASA - MSFC - Marshall Space Flight Center
  • Download PDF : (1.417Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    MSFC-PLAN-2784 REV C

Show full item record

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T17:53:41Z
date available2017-09-04T17:53:41Z
date copyright03/22/2005
date issued2005
identifier otherFFEEIBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoCA5893FD69B7ds6/handle/yse/176860
description abstractThe MSFC Regenerative Environmental Control and Life Support System (ECLSS) Project Configuration Management Plan defines requirements, responsibilities, and procedures for the configuration management (CM) system which shall be applied to the Regenerative ECLSS development and integration activities at MSFC. The Regenerative ECLSS Project shall control the Regenerative ECLSS project baseline documentation under one Configuration Control Board (CCB) with the following projects as membership:
 Project Name                                                              Project Code   Regenerative Environmental Control and Life Support System (ECLSS)        SL3-00  Water Recovery System (WRS) (Includes Urine Processor Assembly) Project   WR3-00  Oxygen Generator Assembly (OGS) (Includes Power Supply Module) Project    OS3-00  Vapor Compression Distillation Flight Experiment (VCD FE) Project         CD3-00  Portable Fan Assembly (PFA) Project                                       PF3-00  Manual Pressure Equalization Valve Sampling Adapter (MPEV SA) Project     IT3-00  Volatile Removal Assembly Flight Experiment (VRA FE) Project              RA3-00


The MSFC Regenerative ECLSS Projects shall identify configurations by baselining technical documentation at progressive project milestones. Through this baselining process, the Projects shall progress the hardware/software baseline from requirements to detail design to hardware/software products. The projects shall control changes to the baseline through the CM System described in this plan.
This plan complies with MPR 8040.1, SSP 41170, and SSP 50123.
languageEnglish
titleMSFC-PLAN-2784 REV Cnum
titleREGENERATIVE ECLSS PROJECT CONFIGURATION MANAGEMENT PLANen
typestandard
page25
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2005
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian