Show simple item record

SY10 CONFIGURATION MANAGEMENT PLAN FOR LAB-ON-A-CHIP APPLICATION DEVELOPMENT (LOCAD) PORTABLE TEST SYSTEM (PTS)

contributor authorMSFC - NASA - MSFC - Marshall Space Flight Center
date accessioned2017-09-04T18:12:22Z
date available2017-09-04T18:12:22Z
date copyright03/07/2005
date issued2005
identifier otherHCMEIBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoF237659669B749A96159DD6E273C9FCD/handle/yse/195435
description abstractPURPOSE
This Configuration Management Plan (CMP) describes the requirements, responsibilities, and procedures for the Lab-On-a-Chip Application Development (Portable Test System (LOCAD-PTS) project configuration management (CM) system. This plan was developed in accordance with MPR 8040.1, and shall be effective for the life of the project.
The PTS is a Commercial Off The Shelf (COTS), rapid, point-of-use test system planned for use on the International Space Station (ISS). The instrument has been designed to operate independently and perform analysis of enzymatic assays related to rapid assessment of microbial contamination. The basic unit is shown in Figure 1. The format is also being considered as an on-board component of life detection instrumentation for future spaceflight missions to look for evidence of life on other planets in our solar system.
languageEnglish
titleMSFC-PLAN-3447num
titleSY10 CONFIGURATION MANAGEMENT PLAN FOR LAB-ON-A-CHIP APPLICATION DEVELOPMENT (LOCAD) PORTABLE TEST SYSTEM (PTS)en
typestandard
page33
statusActive
treeMSFC - NASA - MSFC - Marshall Space Flight Center:;2005
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record