• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ISO - International Organization for Standardization
  • View Item
  •   YSE
  • Industrial Standards
  • ISO - International Organization for Standardization
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ISO DIS 16699

Space systems - Disposal of orbital launch stages

Organization:
ISO - International Organization for Standardization
Year: 2013

Abstract: This standard focuses on disposal of launch vehicle stages used during launch of spacecraft to be operated in space where the launch stages are left in orbit after the spacecraft are released.
End-of-mission disposal of launch vehicle orbital stages broadly means removing the stages from the protected regions of space (see ISO 24113) so as not to collide or otherwise interfere with the other users of those protected regions in the future. ISO 24113 also requires that "During the disposal phase, a spacecraft or launch vehicle orbital stage shall permanently deplete or make safe all remaining on-board sources of stored energy in a controlled sequence." These "passive" actions are typically either accomplished in the course of disposal, or immediately follow the disposal operations. In this document, the term "disposal actions" will refer to both disposal maneuvers and to passivation actions (note: passivation actions are not required after the final maneuver leading to a controlled re-entry).
ISO 24113 provides six options for spacecraft or orbital launch stage disposal. This International Standard specifies techniques for planning and executing disposal of orbital launch stages that are consistent with ISO 24113 requirements, reflect current internationally accepted guidelines, and consider current operational procedures and best practices.
Passivation of the stage is mandatory in all cases even if other disposal methods are not feasible (as noted, passivation is not required after successful maneuvers leading to a controlled reentry).
URI: http://yse.yabesh.ir/std;query=authoF2377D8669B749A/handle/yse/222838
Collections :
  • ISO - International Organization for Standardization
  • Download PDF : (99.71Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ISO DIS 16699

Show full item record

contributor authorISO - International Organization for Standardization
date accessioned2017-09-04T18:41:16Z
date available2017-09-04T18:41:16Z
date copyright2013.05.02
date issued2013
identifier otherJWTXCFAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=authoF2377D8669B749A/handle/yse/222838
description abstractThis standard focuses on disposal of launch vehicle stages used during launch of spacecraft to be operated in space where the launch stages are left in orbit after the spacecraft are released.
End-of-mission disposal of launch vehicle orbital stages broadly means removing the stages from the protected regions of space (see ISO 24113) so as not to collide or otherwise interfere with the other users of those protected regions in the future. ISO 24113 also requires that "During the disposal phase, a spacecraft or launch vehicle orbital stage shall permanently deplete or make safe all remaining on-board sources of stored energy in a controlled sequence." These "passive" actions are typically either accomplished in the course of disposal, or immediately follow the disposal operations. In this document, the term "disposal actions" will refer to both disposal maneuvers and to passivation actions (note: passivation actions are not required after the final maneuver leading to a controlled re-entry).
ISO 24113 provides six options for spacecraft or orbital launch stage disposal. This International Standard specifies techniques for planning and executing disposal of orbital launch stages that are consistent with ISO 24113 requirements, reflect current internationally accepted guidelines, and consider current operational procedures and best practices.
Passivation of the stage is mandatory in all cases even if other disposal methods are not feasible (as noted, passivation is not required after successful maneuvers leading to a controlled reentry).
languageEnglish
titleISO DIS 16699num
titleSpace systems - Disposal of orbital launch stagesen
typestandard
page11
statusDraft
treeISO - International Organization for Standardization:;2013
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian