• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0073

Lessons Learned - MLP 3 SRB Engine Service Platform Hoists

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1992

Abstract: Description of Driving Event:
The SRB platform testing began by loading the platform with 32,000 lbs. of sand. The load was lifted off the ground with a four winch slow speed lift. After clearing the ground, a high speed lift was initiated. An observer reported that a second wrap was beginning on the drums. A slow up mode was initiated and after approximately 12 inches of travel the observer reported the drums were coming apart at the end ring welds. The platforms' "C" corner dropped then the "A" corner dropped. The platform then flipped over, broke the cables and fell to the ground.
URI: http://yse.yabesh.ir/std;query=author:%22NAVY%20-%206159DD6E273C9FCD0Facil/handle/yse/212807
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.98Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0073

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:30:29Z
date available2017-09-04T18:30:29Z
date copyright04/28/1992
date issued1992
identifier otherAIYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=author:%22NAVY%20-%206159DD6E273C9FCD0Facil/handle/yse/212807
description abstractDescription of Driving Event:
The SRB platform testing began by loading the platform with 32,000 lbs. of sand. The load was lifted off the ground with a four winch slow speed lift. After clearing the ground, a high speed lift was initiated. An observer reported that a second wrap was beginning on the drums. A slow up mode was initiated and after approximately 12 inches of travel the observer reported the drums were coming apart at the end ring welds. The platforms' "C" corner dropped then the "A" corner dropped. The platform then flipped over, broke the cables and fell to the ground.
languageEnglish
titleNASA-LLIS-0073num
titleLessons Learned - MLP 3 SRB Engine Service Platform Hoistsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFacilities
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsLifting Devices
subject keywordsParts Materials & Processes
subject keywordsTest & Verification
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian