Show simple item record

API RP 92P

contributor authorAPI - American Petroleum Institute
date accessioned2020-07-05T04:36:11Z
date available2020-07-05T04:36:11Z
date copyrightJune 2019
date issued2019
identifier otherBBBZHGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=author:%22NAVY%20-%206159DD6E273C9FCD0Facil/handle/yse/279853
description abstractThis document addresses recommended practices for pressurized mud cap drilling (PMCD) from a floating rig with a subsea BOP stack. When massive lost circulation conditions are encountered, PMCD can be implemented to allow well construction operations to continue: Although this document only addresses PMCD, most of the equipment described may also be used for the surface back-pressure (SBP) method of managed pressure drilling. However, much of the equipment used for SBP is not required for PMCD, and will not be covered here. The following methods, described briefly, are also used during lost circulation conditions; however, they are outside the scope of this document: a) blind drilling (see 4.3.2); b) continuous annular injection drilling (see 4.3.3); c) floating mud cap drilling (see 4.3.4).
languageEnglish
titleManaged Pressure Drilling Operations- Pressurized Mud Cap Drilling with aSubsea Blowout Preventer - FIRSTEDITIONen
titleAPI RP 92Pnum
typestandard
page67
statusActive
treeAPI - American Petroleum Institute:;2019
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record