• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  •   YSE
  • Industrial Standards
  • API - American Petroleum Institute
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

Managed Pressure Drilling Operations- Pressurized Mud Cap Drilling with aSubsea Blowout Preventer - FIRSTEDITION

API RP 92P

Organization:
API - American Petroleum Institute
Year: 2019

Abstract: This document addresses recommended practices for pressurized mud cap drilling (PMCD) from a floating rig with a subsea BOP stack. When massive lost circulation conditions are encountered, PMCD can be implemented to allow well construction operations to continue: Although this document only addresses PMCD, most of the equipment described may also be used for the surface back-pressure (SBP) method of managed pressure drilling. However, much of the equipment used for SBP is not required for PMCD, and will not be covered here. The following methods, described briefly, are also used during lost circulation conditions; however, they are outside the scope of this document: a) blind drilling (see 4.3.2); b) continuous annular injection drilling (see 4.3.3); c) floating mud cap drilling (see 4.3.4).
URI: http://yse.yabesh.ir/std;query=author:%22NAVY%20-%206159DD6E273C9FCD0Facil/handle/yse/279853
Collections :
  • API - American Petroleum Institute
  • Download PDF : (1.796Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    Managed Pressure Drilling Operations- Pressurized Mud Cap Drilling with aSubsea Blowout Preventer - FIRSTEDITION

Show full item record

contributor authorAPI - American Petroleum Institute
date accessioned2020-07-05T04:36:11Z
date available2020-07-05T04:36:11Z
date copyrightJune 2019
date issued2019
identifier otherBBBZHGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=author:%22NAVY%20-%206159DD6E273C9FCD0Facil/handle/yse/279853
description abstractThis document addresses recommended practices for pressurized mud cap drilling (PMCD) from a floating rig with a subsea BOP stack. When massive lost circulation conditions are encountered, PMCD can be implemented to allow well construction operations to continue: Although this document only addresses PMCD, most of the equipment described may also be used for the surface back-pressure (SBP) method of managed pressure drilling. However, much of the equipment used for SBP is not required for PMCD, and will not be covered here. The following methods, described briefly, are also used during lost circulation conditions; however, they are outside the scope of this document: a) blind drilling (see 4.3.2); b) continuous annular injection drilling (see 4.3.3); c) floating mud cap drilling (see 4.3.4).
languageEnglish
titleManaged Pressure Drilling Operations- Pressurized Mud Cap Drilling with aSubsea Blowout Preventer - FIRSTEDITIONen
titleAPI RP 92Pnum
typestandard
page67
statusActive
treeAPI - American Petroleum Institute:;2019
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian