UFC 4-133-01N CHANGE 4 AND 5
NAVY AIR TRAFFIC CONTROL FACILITIES
Organization:
UFC - Unified Facilities Criteria
Year: 2007
Abstract: This Unified Facilities Criteria (UFC), UFC 4-133-01, contains guidance for (Navy and contract) planners, engineers, and architects on the planning, engineering, and design of Department of the Navy (DoN) air traffic control facilities. This is supplementary guidance to be used in conjunction with Facility Requirements Documents (FRD), Facility Requirements Supplements (FRS), Intrusion Detection Systems Engineering Plans (IDSEP), Base Exterior Architecture Plans (BEAP), and other DoD and Department of Transportation (DOT) material for the planning and construction of Naval air traffic control faculties facilities and the preparation of DD 1391 MILCON and Step II Special Project Submissions. It is assumed that general architectural and engineering standards are known or available to the planner. Navy criteria concerning basic and detailed construction and engineering criteria are not addressed in this UFC and are a prerequisite for facility planning.
Collections
:
-
Statistics
UFC 4-133-01N CHANGE 4 AND 5
Show full item record
contributor author | UFC - Unified Facilities Criteria | |
date accessioned | 2017-09-04T17:06:33Z | |
date available | 2017-09-04T17:06:33Z | |
date copyright | 07/30/2007 | |
date issued | 2007 | |
identifier other | YFMTXEAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;quessionid=47037D83FCDCAC426159DD6E273C9FCDgin/handle/yse/130130 | |
description abstract | This Unified Facilities Criteria (UFC), UFC 4-133-01, contains guidance for (Navy and contract) planners, engineers, and architects on the planning, engineering, and design of Department of the Navy (DoN) air traffic control facilities. This is supplementary guidance to be used in conjunction with Facility Requirements Documents (FRD), Facility Requirements Supplements (FRS), Intrusion Detection Systems Engineering Plans (IDSEP), Base Exterior Architecture Plans (BEAP), and other DoD and Department of Transportation (DOT) material for the planning and construction of Naval air traffic control faculties facilities and the preparation of DD 1391 MILCON and Step II Special Project Submissions. It is assumed that general architectural and engineering standards are known or available to the planner. Navy criteria concerning basic and detailed construction and engineering criteria are not addressed in this UFC and are a prerequisite for facility planning. | |
language | English | |
title | UFC 4-133-01N CHANGE 4 AND 5 | num |
title | NAVY AIR TRAFFIC CONTROL FACILITIES | en |
type | standard | |
page | 72 | |
status | Active | |
tree | UFC - Unified Facilities Criteria:;2007 | |
contenttype | fulltext |