• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 4-212-01N CHANGE 4

NAVY ENGINE TEST CELLS

Organization:
UFC - Unified Facilities Criteria
Year: 2008

Abstract: This UFC contains the basic criteria for the design and maintenance of Navy and Marine engine test facilities. Chapter 5 and 6 provide guidance for the testing of aircraft engine tie-downs. Note: Any engine restraint testing performed within the past three years from the publication date of this UFC is recognized to establish the date the next proof test is due.
URI: http://yse.yabesh.ir/std;quessionid=47037D83FCDCAC426159DD6E273C9FCDgin/handle/yse/86586
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (1012.Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 4-212-01N CHANGE 4

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T16:23:17Z
date available2017-09-04T16:23:17Z
date copyright09/04/2008
date issued2008
identifier otherTSCJMCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;quessionid=47037D83FCDCAC426159DD6E273C9FCDgin/handle/yse/86586
description abstractThis UFC contains the basic criteria for the design and maintenance of Navy and Marine engine test facilities. Chapter 5 and 6 provide guidance for the testing of aircraft engine tie-downs. Note: Any engine restraint testing performed within the past three years from the publication date of this UFC is recognized to establish the date the next proof test is due.
languageEnglish
titleUFC 4-212-01N CHANGE 4num
titleNAVY ENGINE TEST CELLSen
typestandard
page53
statusActive
treeUFC - Unified Facilities Criteria:;2008
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian