• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5200

Lessons Learned - Vehicle versus Ground Synchronization

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: During the Constellation Program, rework caused excessive costs and schedule slip. The rework resulted from a lack of coordination in the design and development of flight hardware and ground support equipment. Synchronization of design engineering activities and baseline documentation would address this problem, and should be performed as a fundamental systems engineering best practice.
URI: https://yse.yabesh.ir/std/handle/yse/100346
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (59.74Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5200

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:36:47Z
date available2017-09-04T16:36:47Z
date copyright05/08/2012
date issued2012
identifier otherVDWBXEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/100346
description abstractDuring the Constellation Program, rework caused excessive costs and schedule slip. The rework resulted from a lack of coordination in the design and development of flight hardware and ground support equipment. Synchronization of design engineering activities and baseline documentation would address this problem, and should be performed as a fundamental systems engineering best practice.
languageEnglish
titleNASA-LLIS-5200num
titleLessons Learned - Vehicle versus Ground Synchronizationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian