Abstract: Description of Driving Event:
December 9, 1982, the 80 x 120 foot wind tunnel at the Ames Research Center was undergoing commissioning/shakedown testing when Vane Set 5 collapsed destroying the vane set, the fan blades of all six drive motors, and damaging the tunnel itself.
December 9, 1982, the 80 x 120 foot wind tunnel at the Ames Research Center was undergoing commissioning/shakedown testing when Vane Set 5 collapsed destroying the vane set, the fan blades of all six drive motors, and damaging the tunnel itself.
Subject: Safety & Mission Assuranc
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:37:43Z | |
| date available | 2017-09-04T16:37:43Z | |
| date copyright | 02/28/1983 | |
| date issued | 1983 | |
| identifier other | BRBEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/101212 | |
| description abstract | Description of Driving Event: December 9, 1982, the 80 x 120 foot wind tunnel at the Ames Research Center was undergoing commissioning/shakedown testing when Vane Set 5 collapsed destroying the vane set, the fan blades of all six drive motors, and damaging the tunnel itself. | |
| language | English | |
| title | NASA-LLIS-0495 | num |
| title | Lessons Learned - Systems Engineering, System Safety and R&QA Program Integration, Operational Safety and Performance, Risk Management, and Facility Safety Inspections | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1983 | |
| contenttype | fulltext | |
| subject keywords | Safety & Mission Assuranc | |
| subject keywords | Test Facility |

درباره ما