• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-2336

Lessons Learned - Phoenix TEGA Door Opening Anomaly

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2009

Abstract: Abstract:
A mechanical interference, attributed to inadequate processes and procedures for instrument design, verification, and validation, prevented the full opening of a set of instrument doors following the landing of Mars Phoenix. The problem was attributed to the instrument contractor's inadequate documentation of the anomaly, and failure to adequately communicate a redlined design change to a subcontractor. The anomaly also represents a violation of the "test-as-you-fly" principle.
URI: https://yse.yabesh.ir/std/handle/yse/102548
Subject: Configuration Change Control
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (121.9Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-2336

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:38:57Z
date available2017-09-04T16:38:57Z
date copyright07/07/2009
date issued2009
identifier otherVJSKQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/102548
description abstractAbstract:
A mechanical interference, attributed to inadequate processes and procedures for instrument design, verification, and validation, prevented the full opening of a set of instrument doors following the landing of Mars Phoenix. The problem was attributed to the instrument contractor's inadequate documentation of the anomaly, and failure to adequately communicate a redlined design change to a subcontractor. The anomaly also represents a violation of the "test-as-you-fly" principle.
languageEnglish
titleNASA-LLIS-2336num
titleLessons Learned - Phoenix TEGA Door Opening Anomalyen
typestandard
page5
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2009
contenttypefulltext
subject keywordsConfiguration Change Control
subject keywordsConfiguration Management
subject keywordsFlight Equipment
subject keywordsHardware
subject keywordsMishap Reporting
subject keywordsPayloads
subject keywordsQuality
subject keywordsRobotics
subject keywordsSpacecraft
subject keywordsSpacecraft and Spacecraft Instruments
subject keywordsTest & Verification
subject keywordsTest Article
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian