• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1524

Lessons Learned - Next Generation Launch Technology (NGLT)/Develop an Integrated Master Schedule in the Formulation Phase

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2004

Abstract: Abstract:
Due to the creation of NGLT as a merger of two different programs, the Program had not fully achieved one integrated master schedule linking all NGLT projects with standardized schedule formats at the time of Program closing. Programs should clearly identify milestones that all projects need to meet (versus a roll-up of project-level milestones) during formulation.
URI: https://yse.yabesh.ir/std/handle/yse/104189
Subject: Policy & Planning
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.16Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1524

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:40:50Z
date available2017-09-04T16:40:50Z
date copyright07/01/2004
date issued2004
identifier otherVNWEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/104189
description abstractAbstract:
Due to the creation of NGLT as a merger of two different programs, the Program had not fully achieved one integrated master schedule linking all NGLT projects with standardized schedule formats at the time of Program closing. Programs should clearly identify milestones that all projects need to meet (versus a roll-up of project-level milestones) during formulation.
languageEnglish
titleNASA-LLIS-1524num
titleLessons Learned - Next Generation Launch Technology (NGLT)/Develop an Integrated Master Schedule in the Formulation Phaseen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2004
contenttypefulltext
subject keywordsPolicy & Planning
subject keywordsProgram and Project Management
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian