• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-6396

Lessons Learned - An Electrical Outage Revealed Emergency Systems Not Functioning as Expected

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2012

Abstract: JPL experienced a total electrical power loss in June 2010 due to an operator error at a public utility substation. Deficiencies were noted in the emergency response and notifications, and in the operation of emergency generators and emergency lighting. Process changes are needed to address the significant potential impacts of these deficiencies on personnel, flight assets, and JPL activities.
URI: https://yse.yabesh.ir/std/handle/yse/106823
Subject: Additional Categories.Emergency Preparedness
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (108.9Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-6396

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:43:32Z
date available2017-09-04T16:43:32Z
date copyright02/09/2012
date issued2012
identifier otherBSOMUEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/106823
description abstractJPL experienced a total electrical power loss in June 2010 due to an operator error at a public utility substation. Deficiencies were noted in the emergency response and notifications, and in the operation of emergency generators and emergency lighting. Process changes are needed to address the significant potential impacts of these deficiencies on personnel, flight assets, and JPL activities.
languageEnglish
titleNASA-LLIS-6396num
titleLessons Learned - An Electrical Outage Revealed Emergency Systems Not Functioning as Expecteden
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext
subject keywordsAdditional Categories.Emergency Preparedness
subject keywordsAdditional Categories.Facilities
subject keywordsAdditional Categories.Fire Protection
subject keywordsAdditional Categories.Safety & Mission Assurance
subject keywordsSafety and Mission Assurance.Advanced planning of safety systems
subject keywordsSafety and Mission Assurance.Maintenance
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian